- WA246P
- WA254P
- WA33R
- TL/2
- TP/7







 

Maitland Gas Field Appraisal (WA-33R)
PPP 10%

The joint venture Operator, Apache, has completed an assessment of the Maitland project after incorporation of the results from the 2007 drilling campaign. While the technical challenges of drilling and producing in the Maitland field are in the process of being resolved, the Maitland-2 core data and Maitland-3H test results have resulted in some reserves uncertainty. The Operator is now working on options to reduce that reserves uncertainty to a level that would allow a development to proceed, including the possibility of further appraisal drilling and flow testing.

The Maitland gas field was discovered in August 1992 with the drilling of Maitland-1. The first appraisal well, Maitland North-1, was drilled in January 1996 and confirmed the general size and quality of the field. Following a major review of available seismic and well data, Maitland-2 and Maitland-3H were drilled in August/September 2007. Maitland-2 confirmed the existence of a 23m gross gas column and a sidetrack was used to obtain core in the target reservoir. Maitland-3H was then drilled as a 500m horizontal well and tested at 6 million cubic feet per day constrained by sand production.

Permit Interests: Carnarvon Basin

Permit Reference PPP Interest % Gross Area km2
TL2 23.2 401
TP7[1&2] 4.2 703
TP7[3] 4.2 320
TP7[4] 4.2 225
WA33R 10.0 320
WA256P 10.0 323
WA246P 10.0 323
WA254P[1,3,4] 2.9 243
WA254P[2] 5.2 81
Total 2,616